top of page
Structure 4WG Replacement
Timeline: 2021 - 2021
Location: Fergus, Ontario
Description:
The Structure 4WG Replacement consisted of the removal of an existing concrete arch bridge, water diversion and control of the waterway, construction of a 8.9m span integral abutment bridge with prestressed concrete box beams, and building up the existing roadway approaches to meet the new bridge deck elevation.
bottom of page