top of page
PXL_20210621_192006274.MP.jpg

Murphy’s Road Bridge Replacement

Timeline:       2021 - 2022
Location:       Mattawan, Ontario
Description:

The Murphy’s Road Bridge Replacement involved the construction of a 24.9m single span steel girder bridge over Antoine Creek. Components of the work included the removal of the existing structure as well as the supply and placement of reinforced concrete, structural steel, side mount box beam railing, guide rail and the reconstruction of roadway approaches.

PXL_20210621_192006274.MP.jpg
PXL_20210812_142356071.jpg
PXL_20210812_151105387 (1).jpg
bottom of page