Murphy’s Road Bridge Replacement

Timeline:       2021 - 2022
Location:       Mattawan, Ontario
Description:

The Murphy’s Road Bridge Replacement involved the construction of a 24.9m single span steel girder bridge over Antoine Creek. Components of the work included the removal of the existing structure as well as the supply and placement of reinforced concrete, structural steel, side mount box beam railing, guide rail and the reconstruction of roadway approaches.